by slimey » Mon Dec 07, 2015 7:12 am
Got a bit of time to "play" over the weekend and started to fit the Delkevic system, It came with all the stuff you see in the picture in my original post
as well as that there is a spring puller, a tube of hi-temp grease for assembly and a centre stand "stopper."
It's a very well engineered bit of kit - a bit tricky to fit the nuts to the inner 2 headers with frame members
being very close to the studs and a close fit of the flanges on the studs.
Quality of the welds has to be seen to be believed - very neat with good penetration.
Hope to complete the assembly this week - will take some pics and post 'em.
Current Project
'78 Z1-R
Previous Kwakas
Zephyr 750
H2A x 2
Z1-R x 2
Z900
Z650
H1B